Your pay: Paid in cash at end of job finished. Willing to pay the going hourly rate not looking for bids.
Project: Install Maax 4 piece shower unit(48X34), you set the center drain as needed(ABS). Plumbing is copper.
Details: I will demo the unit and drywall have everything prepped and provided as much as possible. Was told brass center drain would be best. Also mortar set under the unit. Looking to reuse the hot/cold valve and shower head if you say other wise. Not sure if new shower walls are taller than what is installed now.
Available days: Friday, Saturday or Sunday. Would prefer Friday.
Your experience: Need to have done these installs before.