Recent Major Upgrades & Systems
Move in with total peace of mind. This home features extensive recent updates:
• Septic Pump: Replaced (2025)
• Water Heater: Replaced (November 2024)
• Foundation & Drainage: Slate foundation enhancement, new retaining wall, drainage improvements, plus new gravel and grading (All 2024)
• Steel Garage: 24' x 35' High-Gauge Steel Garage built on a 25' x 51' concrete slab (May 2024)
• Exterior Paint: Whole house repainted (July 2024)
• Reverse Osmosis: Water system replaced (November 2023)
• Septic Tank: Pumped (May 2023)
• Roof: Metal roof installed (July 2022)
• Water Treatment: System recharged (June 2020)
• HVAC Systems: Upstairs unit replaced (July 2020); Downstairs unit replaced (January 2019)
• Well Pump: Replaced (April 2019)
Offering general concession.
Open house hours: 1:00 P.M. to 5 P.M.