I need a drain line installed on first floor of my building- which is on slab. Therefore- cutting of the concrete floor to create the drain line. It looks like about an 8 or 9 ft run to connection with the existing drain line. Then I need the hot and cold supply lines extended to the new sink as part of the installation of the new sink and faucet.
I will pay $50/hour in cash. Payment at the end of each work day. I will buy all parts- even one cutting blade.
My building is right on Delaware; about 1/2 way between the 290 and Sheridan Drive.
Principals only. Recruiters, please don't contact this job poster.