I have approximately 250 20 ft sticks of rebar. I need them tied double Mat,12 in on center two 24 ft wide by 12 ft high,and two 20 ft wide four sets, also a 24x 20' x8"slab tied, and 4 double Mat 20 ft x 12" footing. I'll pay$3,000 must have your own tools, and willing to dig the footings and clean out erosion and experience. I'm willing to pay 5k+ if you have the forms and get it pour ready